What happened before
- The Space and Construction Planning Act (until 2025) allowed construction to begin on the basis of a building notice instead of a full permit. This simplified the launch of procedures and reduced the administrative burden for developers.
- Many permitting and planning powers were centralized, with much of the task performed at the government (ministerial) level and with the participation of central authorities.
- Some types of permits, technical inspections and acceptances have been abolished or replaced, or their issuance has been transferred to the municipal level.
What has changed now - new rules
Since March 2025, the Law On the Construction of Facilities came into force, which replaced the previous legislation.
Key changes:
- Return of the building permit as a mandatory document for the start of construction.
- Decentralization of permitting - permits up to a certain area (3,000 m²) can be issued by the municipality, and for large objects, objects of special interest or tourist sites - by state authorities.
- Simplifications for individual residential buildings - in terms of requirements, documentation and procedures.
- Standards and qualifications - licensing of professionals (designers, supervision, inspectors), requirements for projects (modified plans, reports, agreements with architects, insurance).
- Time limits and responsibilities - the law establishes clear time frames for issuing permits and completing construction; liability for non-compliance with requirements and standards increases.
Main difficulties and risks with the new rules
- Growth of bureaucracy. The return of mandatory permission means that instead of a simple notification, you will need to collect a full set of documents, go through approvals, and possibly wait longer for approval. This may increase time and costs.
- Heterogeneity in the work of municipalities. Permits for the construction of objects up to 3,000 m² are transferred to local authorities for registration, not all municipalities may be ready for this - a lack of personnel, infrastructure or a clear understanding of procedures can create a risk of delays or heterogeneity of decisions.
- Uncertainty in legislative practice. Not all by-laws and regulations have yet been adopted, so there are gaps in how exactly to apply some provisions.
What to pay attention to
Documents for the plot
– make sure that the land is registered in the cadastre and its purpose corresponds to the plan. Also, special attention should be paid to the availability of access to the site - a state road.
Urban development plan
– check whether a detailed urban plan (DUP / PUP) exists for the territory; without it, permission may not be issued.
Project documentation
– project documentation is drawn up by a licensed designer (architect), as well as a full package of documents that meets the new requirements.
Determine the level of permission
– up to 3,000 m² - contact the municipality;
– over 3,000 m² or for tourist/significant objects - through government agencies - Ministry of Urbanism
Time limits
– keep in mind that obtaining permission will take longer than the notification procedure. Allow some reserve in the construction schedule.
The new procedure for obtaining permits in Montenegro makes the construction process more transparent, but also more complex in terms of bureaucracy and deadlines. It is important to check the site in advance, prepare a project and collect a complete package of documents to avoid delays and unnecessary costs.
The company Adriatic Point Construction provides services for project support and preparation of all necessary documentation - from site inspection to obtaining a building permit.
We help you complete the procedure quickly, legally and with minimal risks for the client.