Comprehensive construction of a multi-unit residential building, covering the full construction cycle through to property handover
Climate systems, ventilation were installed, and heat-insulating materials were also used during the construction of the building
⠀
The garage is located on the ground floor, video surveillance is connected around the entire perimeter of the building, cable internet is connected to the house
⠀
High-quality Italian ceramic tiles were used for the interior decoration of the apartments, sets of several lighting options were installed.
⠀
In total, there are 2 types of apartments in the new building: with 1 bedroom – 61 m2 and with 2 bedrooms – 83 m2
We will prepare the next step: from assessing potential and budget to a proposal for design or construction.
We will outline possible implementation scenarios, preliminary economics and participation format.
Обсудим задачу, оценим объем работ и предложим формат участия AdriaticPoint в реализации объекта.