Comprehensive construction of a multi-unit residential building, covering the full construction cycle through to property handover
The work is divided into 2 stages:
1. Thermal insulation of the facade. Expanded polystyrene 5 cm thick is mounted on the walls of the building, covered with facade glue with a reinforcing mesh. The surface is leveled and decorative facade plaster is applied, after which painting is carried out.
2. Installation of the facade of an apartment building made of natural stone. The walls of the lower floor of the building, in which the garage is located, are lined with local stone, which is processed in large texture forms to harmoniously position the building with the surrounding landscape.
The second, third and fourth residential floors are lined with Italian travertine stone with a smooth matte finish. Before installing the stone, the thermal insulation layer of the facade was covered with waterproofing and reinforced with a reinforced mesh. The stone was mounted on a special glue for outdoor work. The joints of the stone are filled with grout.
The large area of ββthe stone faΓ§ade (about 500 m2) required careful observance of the installation geometry, which was done by our company’s specialists.
We will prepare the next step: from assessing potential and budget to a proposal for design or construction.
We will outline possible implementation scenarios, preliminary economics and participation format.
ΠΠ±ΡΡΠ΄ΠΈΠΌ Π·Π°Π΄Π°ΡΡ, ΠΎΡΠ΅Π½ΠΈΠΌ ΠΎΠ±ΡΠ΅ΠΌ ΡΠ°Π±ΠΎΡ ΠΈ ΠΏΡΠ΅Π΄Π»ΠΎΠΆΠΈΠΌ ΡΠΎΡΠΌΠ°Ρ ΡΡΠ°ΡΡΠΈΡ AdriaticPoint Π² ΡΠ΅Π°Π»ΠΈΠ·Π°ΡΠΈΠΈ ΠΎΠ±ΡΠ΅ΠΊΡΠ°.