Comprehensive construction of a multi-unit residential building, covering the full construction cycle through to property handover
What have we implemented in this project?
Development of a design project, complex equipment with furniture and appliances
– Replacement of flooring, skirting boards in all rooms;
– Transfer of switches, sockets and connection points for plumbing fixtures;
– Complete replacement of ceramic tiles and plumbing in bathrooms with installation of underfloor heating;
– Arrangement of a dressing room at the entrance
– Installation of ceiling niches for LED lighting;
– Alignment, painting of walls and ceilings with Tikkurila paint;
– Installing a kitchen with a natural granite countertop and installing an apron
– Replacement of interior doors,
The most comfortable interior for living has been implemented:
– multiple lighting scenarios
– a large number of places for storage and organization of space (built-in wardrobes, designer cabinets)
– a kitchen with an optimal number of cabinets, built-in appliances and a large free space for cooking
– in addition to air conditioners, comfort and warmth in the apartment will be maintained by vertical wall convectors
We will prepare the next step: from assessing potential and budget to a proposal for design or construction.
We will outline possible implementation scenarios, preliminary economics and participation format.
ΠΠ±ΡΡΠ΄ΠΈΠΌ Π·Π°Π΄Π°ΡΡ, ΠΎΡΠ΅Π½ΠΈΠΌ ΠΎΠ±ΡΠ΅ΠΌ ΡΠ°Π±ΠΎΡ ΠΈ ΠΏΡΠ΅Π΄Π»ΠΎΠΆΠΈΠΌ ΡΠΎΡΠΌΠ°Ρ ΡΡΠ°ΡΡΠΈΡ AdriaticPoint Π² ΡΠ΅Π°Π»ΠΈΠ·Π°ΡΠΈΠΈ ΠΎΠ±ΡΠ΅ΠΊΡΠ°.