Comprehensive construction of a multi-unit residential building, covering the full construction cycle through to property handover
The project of an apart-hotel with a swimming pool in Budva, developed by our architects. The building is planned for development in two phases: the first wing, which will be closer to the pool, will be erected at first and serve as an independent object. In the future, a larger complex will be added. These details are provided for by our project and allow us to build the building in stages. Each apartment has its own terrace and the overall picture of the complex is very dynamic and modern.
Geolocation: Budva
Number of apartments: 32
Plot area: 1600m2
Project development time: 2 months
We will prepare the next step: from assessing potential and budget to a proposal for design or construction.
We will outline possible implementation scenarios, preliminary economics and participation format.
Обсудим задачу, оценим объем работ и предложим формат участия AdriaticPoint в реализации объекта.